RakSiam Global
Engineering blueprint on weathered wooden workbench under warm desk lamp
← All resources
LIGHTING WORKSHEET

Trailer LED Lighting RFQ & Evidence Worksheet

A printable intake sheet for lamp function, installation, envelope, connector, electrical performance, evidence, volume, and change control.

Use for required vehicle lamps, reflective devices, work lamps, or related electrical assemblies. Complete one function/configuration per sheet.

Company / program
Prepared by
Date
Target quote date
01

Application and program

Lamp function and position

Stop/tail/turn, marker, clearance, ID, license, reverse, work, reflector, side/rear position.

Vehicle and target market

Trailer/vehicle type, installation location, target countries, and responsible approval owner.

Volume, release, and timing

Annual units, release quantity, launch date, destination, and normal cadence.

Controlled reference

Drawing, current part/sample, intended replacement, revision, and approved evidence baseline.

02

Mechanical and electrical

Envelope and mounting

Overall dimensions, hole/grommet/bracket, orientation, visibility, clearance, lens color.

Connector and harness

Connector family, pinout/polarity, wire gauge/length/color, seal, terminals, and strain relief.

Electrical requirement

Nominal/range voltage, current/power, function logic, grounding, protection, and diagnostics.

Environmental requirement

Ingress, vibration, temperature, corrosion, UV, chemical, transient, and life targets.

03

Compliance and production control

Applicable requirements

Buyer-defined FMVSS/CMVSS/SAE or other requirements by exact lamp function and installation.

Configuration-matched evidence

Reports, drawings, markings, photos, model, lens, electronics, and production configuration.

Approval and lot control

Sample/FAI plan, inspection points, test frequency, traceability, and lot documents.

Change control and packaging

Controlled components, notification/approval timing, labels, carton, and cosmetic protection.

Approval cautions

  • A generic “DOT” mark or unrelated family report is not a complete qualification package.
  • Vehicle engineering must define applicability, installation, and final approval requirements.
  • The production lamp and its evidence must remain tied through configuration and change control.

Landed cost, itemized and reduced.

Get an honest landed-cost quote. Itemized, every line. No deck. No runaround.

Get a quoteBook a 30-min call